IEC/TR 61850-7-510 Ed. 2.0 en:2021 PDF

IEC/TR 61850-7-510 Ed. 2.0 en:2021 PDF

Name:
IEC/TR 61850-7-510 Ed. 2.0 en:2021 PDF

Published Date:
12/01/2021

Status:
Active

Description:

Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines

Publisher:
International Electrotechnical Commission - Technical Report

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$153.6
Need Help?

This part of IEC 61850, which is a technical report, is intended to provide explanations on how to use the Logical Nodes defined in IEC 61850-7-410 as well as other documents in the IEC 61850 series to model complex control functions in power plants, including variable speed pumped storage power plants.

IEC 61850-7-410 introduced the general modelling concepts of IEC 61850 for power plants. It is however not obvious from the standard how the modelling concepts can be implemented in actual power plants.

This document explains how the data model and the concepts defined in the IEC 61850 standard can be applied in Hydro; both directly at the process control level, but also for data structuring and data exchange at a higher level. Application of the data model for Thermal is limited to power evacuation (in principle the extraction of the generated electrical power) and the prime mover shaft and bearing system. The interfaces of the fuel and steam valves are modelled for the purpose of process control.

Communication services, and description of the use of mappings of the IEC 61850 data model to different communication protocols, are outside the scope of this document.


File Size : 1 file , 8.5 MB
ISBN(s) : 9782832210622
Note : This product is unavailable in Russia, Belarus, Ukraine, Canada
Number of Pages : 174
Published : 12/01/2021

History

IEC/TR 61850-7-510 Ed. 2.0 en:2021
Published Date: 12/01/2021
Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
$153.6
IEC/TR 61850-7-510 Ed. 1.0 en:2012
Published Date: 03/22/2012
Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
$117.6

Related products


Best-Selling Products

NCSL CALIB
Published Date:
Calibration Laboratory Manager´s Guidebook
NCSL RISP-1
Published Date: 01/01/2017
Josephson Voltage Standard
NCSL RISP-3
Published Date: 08/01/1997
Quantized Hall Resistance
NCSL RISP-4
Published Date: 07/01/1998
Deadweight Pressure Gauges
NCSL RISP-5
Published Date: 01/01/2017
Two-Pressure, Two Temperature Humidity Generator
NCSL RP-10
Published Date: 01/01/2004
Operation of Electric Utility Metrology Lab